M
  • Home
  • About
  • Our Services
    • Sandblasting
    • Commercial Painting
    • Industrial Painting
  • Gallery
  • Articles
  • Contact
Lead Testing First: Water Tank Sandblasting RFP for Facility Managers

Lead Testing First: Water Tank Sandblasting RFP for Facility Managers

by | Aug 29, 2026 | Southern Sandblasting & Painting

Abrasive blasting, done with proper containment and monitoring, is the most reliable way to strip old coatings and corrosion from a water tank and leave behind the surface profile that new coatings need to bond. It works on steel, concrete, and most industrial tank...
ISO 12944 Categories Explained for Coating Specifiers

ISO 12944 Categories Explained for Coating Specifiers

by | Aug 28, 2026 | Southern Sandblasting & Painting

ISO 12944 categories are the classification system that tells you how corrosive an environment is and what coating system it demands, sorted into atmospheric classes C1 through C5 (plus CX for extreme offshore exposure) and immersion classes IM1 through IM4. Every...
Choosing Secondary Containment Coatings for Chemical Storage

Choosing Secondary Containment Coatings for Chemical Storage

by | Aug 27, 2026 | Southern Sandblasting & Painting

Match the coating chemistry to what the containment actually holds, not to what’s cheapest or fastest to install. Novolac epoxy handles continuous immersion in fuels, oils, and most acids. Vinyl ester takes over when oxidizers or chlorinated solvents enter the...
Sandblasting Cost for Industrial and Municipal Projects

Sandblasting Cost for Industrial and Municipal Projects

by | Aug 26, 2026 | Southern Sandblasting & Painting

Industrial sandblasting typically runs $2 to $9 per square foot, with full project totals for mid-size assets landing between $2,000 and $18,000 depending on scale, access, and coatings involved. Heavier jobs with hazardous coatings, tight geometry, or strict...
What OSHA Actually Requires for Floor Marking

What OSHA Actually Requires for Floor Marking

by Southern Sandblasting Painting LLC | Aug 25, 2026 | Southern Sandblasting & Painting

OSHA’s floor marking rule is short and often misread: 29 CFR 1910.176(a) requires that “permanent aisles and passageways” in workplaces using mechanical handling equipment be “appropriately marked.” That’s it. The standard is performance-based. It doesn’t name a...
Concrete Surface Profile CSP: What to Specify and Verify

Concrete Surface Profile CSP: What to Specify and Verify

by Southern Sandblasting Painting LLC | Aug 24, 2026 | Southern Sandblasting & Painting

A concrete surface profile (CSP) is the quantified texture of prepared concrete, measured on a scale of 1 to 10, and it determines whether a coating or overlay actually bonds or peels off within a year. Get the CSP wrong and you get delamination, blistering, or a...
« Older Entries
Next Entries »

Recent Posts

  • Specifying High Build Epoxy Lining: 20+ Years of Field Tested Specs
  • Avoid Costly Recoats: Industrial Painting Cost for Facility Managers
  • Restriping Triggers Compliance: ADA Parking Rules & Prep for US Contractors
  • Return Floors in Hours: Polyaspartic Topcoats, PDS & Prep for Contractors
  • Abrasive Blasting PPE: What U.S. Supervisors Must Verify, APF 25–2,000

Recent Comments

No comments to show.
Southern Sandblasting & Painting Logo
Q

430 Fairvilla Rd, Orlando, FL 32808

(407) 409-1158
info@southernsandblastingandpainting.com
  • Sandblasting
  • Commercial Painting
  • Industrial Painting
  • Gallery
  • About Us
  • Contact
© 2026 Southern Sandblasting Painting LLC | All Rights Reserved | Privacy Policy | Website Design by Results Digital