Menu

Articles

Technician injecting water into a Bresle patch on steel

Stop Coating Blisters: Bresle Salt Tests in 5–10 Minutes

The Bresle test extracts water-soluble salts from a steel surface and measures the extract’s conductivity to estimate NaCl-equivalent surface density, expressed in mg/m² or µg/cm². Inspectors run it after blasting, before coating, as a go/no-go checkpoint. A valid...

Painter spraying primer on a steel beam

ISO 12944 Categories Explained for Coating Specifiers

ISO 12944 categories are the classification system that tells you how corrosive an environment is and what coating system it demands, sorted into atmospheric classes C1 through C5 (plus CX for extreme offshore exposure) and immersion classes IM1 through IM4. Every...

Worker blasting a concrete floor in a plant

Choosing Secondary Containment Coatings for Chemical Storage

Match the coating chemistry to what the containment actually holds, not to what’s cheapest or fastest to install. Novolac epoxy handles continuous immersion in fuels, oils, and most acids. Vinyl ester takes over when oxidizers or chlorinated solvents enter the...

Blaster in a hood sandblasting a concrete wall

Sandblasting Cost for Industrial and Municipal Projects

Industrial sandblasting typically runs $2 to $9 per square foot, with full project totals for mid-size assets landing between $2,000 and $18,000 depending on scale, access, and coatings involved. Heavier jobs with hazardous coatings, tight geometry, or strict...

Worker rolling a yellow safety stripe in a warehouse

What OSHA Actually Requires for Floor Marking

OSHA’s floor marking rule is short and often misread: 29 CFR 1910.176(a) requires that “permanent aisles and passageways” in workplaces using mechanical handling equipment be “appropriately marked.” That’s it. The standard is performance-based. It doesn’t name a...

Worker checking a concrete surface sample with a gauge

Concrete Surface Profile CSP: What to Specify and Verify

A concrete surface profile (CSP) is the quantified texture of prepared concrete, measured on a scale of 1 to 10, and it determines whether a coating or overlay actually bonds or peels off within a year. Get the CSP wrong and you get delamination, blistering, or a...

Worker rolling a yellow stripe on a warehouse floor

Warehouse Floor Striping: The Complete Compliance Guide

For permanent forklift aisles, use two-pack epoxy over a properly shot-blasted or diamond-ground floor. For leased space or pedestrian zones you’ll reconfigure within a year or two, use heavy-duty floor tape. For outdoor yards and loading docks, thermoplastic holds up...