Budget roughly a few dollars per square foot for standard interior industrial painting, and significantly more per square foot for heavy blast-and-coat work on tanks and structural steel. The single biggest swing factor is surface preparation and access, not paint...
Articles
Restriping Triggers Compliance: ADA Parking Rules & Prep for US Contractors
Every accessible parking space needs a sign with the International Symbol of Accessibility mounted at least 60 inches to the bottom edge, a van-accessible designation where required, a minimum width space for cars, a wider configuration for vans, or a car-width space...
Return Floors in Hours: Polyaspartic Topcoats, PDS & Prep for Contractors
Polyaspartic topcoats are fast-curing, UV-stable aliphatic polyurea coatings that return floors to service in hours rather than days, resist yellowing outdoors, and outperform standard epoxy on abrasion. They’re the right call for garage floors, industrial floors on a...
Abrasive Blasting PPE: What U.S. Supervisors Must Verify, APF 25–2,000
A NIOSH-approved Type CE abrasive-blast supplied-air respirator, an impact-rated helmet or hood, eye and face protection, hearing protection, heavy leather gauntlet gloves, an abrasion-resistant apron or coveralls, and steel-toe boots are the baseline for any abrasive...
FAA RFP Ready Runway Marking Paint Checklist for U.S. Airports
For U.S. airports, runway marking paint work means contractor-applied, FAA-compliant surface preparation, marking application with glass beads, and on-site retroreflectivity testing. Any scope of work you sign should require AC 150/5340-1 and Item P-620 compliance, a...
Avoid Rework: $1.50–$5.00 Concrete Sealing Cost for Facility Managers
Installed industrial and municipal concrete sealing typically runs $1.50 to $5.00 per square foot, with basic densifiers at the low end and epoxy or polyurethane systems at the high end. The single biggest swing factor isn’t the coating you pick. It’s surface...
4 Mill Scale Removal Methods Coating Pros Rely On for SSPC SP10
For large new fabrication, abrasive blasting is the right call. For field welds, tight access, or spot repairs, mechanical power tools or a grit-free impact tool get you there without containment headaches. Acid pickling belongs in a controlled shop, on complex...
Facility Managers: Require Wet DCOF for Non Slip Industrial Coatings
For concrete floors, specify a textured epoxy or polyurethane system with broadcast aggregate, or a cementitious overlay for heavy wear zones. For metal, specify a properly prepared, primed textured coating or a thermal-sprayed finish. Before you sign anything, ask...
For Facility Managers: Protective Coating Cost per Year, Skip Low Bids
Installed industrial protective coatings typically vary widely in cost depending on system and exposure, but that number alone will mislead you. The right way to budget is cost-per-year of service life, not the lowest bid on the page. TL;DR: Complete quotes should...









