Surface profile is the blast-produced anchor pattern on steel, measured as the average peak-to-valley height and expressed in mils (thousandths of an inch) or micrometers (µm). Before any blasting begins, you need three things locked into your project documents: a...
Articles
ANSI Pipe Color Coding: A13.1 Compliance Guide for Facilities
ASME A13.1 is the U.S. standard for pipe color coding, and it works in tandem with ANSI Z535.1 safety-color specifications. Together, they define exactly which background-and-legend color pairs to use, how large the markers must be, where to place them, and what to do...
What Experienced Contractors Deliver for Industrial Infrastructure
Experienced industrial surface-prep and protective-coatings contractors deliver compliant abrasive blasting, correctly specified coating systems, documented QA/QC, and enforceable safety controls that extend asset life and reduce total lifecycle cost. For municipal...
NACE Certification Explained for Contractors and Asset Owners
When professionals reference “NACE certification” today, they mean credentials issued by AMPP (Association for Materials Protection and Performance), the organization formed when NACE International and SSPC merged. The flagship credential is the AMPP Coatings...
Project Safety Procedures Guide for Construction Managers
A project safety procedures guide must make site hazards predictable, assign clear authority, and document controls so every worker knows exactly what to do before the first tool swings. Start today by naming a competent person and walking the site. BLS data show...
Infrastructure Maintenance Tips for Municipal and Industrial Assets
The most effective approach to infrastructure upkeep combines planned asset management, SSPC-SP 10 surface preparation, specification-grade coatings, documented contractor QC (SSPC-QP1/QP2/QP3), and scheduled inspections using ASTM D4417 for profile measurement. Get...
Proven Ways to Extend Asset Lifespan for Maintenance Managers
The highest-impact ways to extend asset lifespan combine the right maintenance strategy for each asset tier, continuous condition monitoring, correct surface protection and coatings, a criticality-tiered spares policy, and maintainability built into design from day...
Step by Step Project Planning: The Complete PM Guide
A complete, execution-ready project plan follows 11 steps: 1) Define goals and success criteria, 2) Define scope and build the WBS, 3) Sequence activities and set milestones, 4) Estimate durations, costs, and resources, 5) Build the schedule and assign resources, 6)...
How to Prepare Water Tanks: Municipal Manager’s Checklist
TL;DR: Proper preparation for a water tank recoating project involves establishing safety, contamination controls, and surface standards aligned with industry regulations. Owners must verify hazardous material testing, structural integrity, and coating certification...